A Glimpse of Our Highway Grinding and Grooving Work

A truck driving down the street with smoke coming out of it.

Pensacola Bay Bridge,FL

  • 95,000 syds of diamond grinding
  • 95,000 syds of bridge deck grooving
A yellow road roller is on the side of a street.

Northwest Corridor - Atlanta, GA

  • 100,000 syds of diamond grinding
  • 100,000 syds of bridge deck grooving
An aerial view of a runway and the construction area.
Hwy 360 -Mansfield,TX 430,000 syds of diamonds grinding
A close up of the side of a road

Segment K - Shreveport, LA

  • 27,000 syds of diamond grinding segmental bridge deck
  • 27,000 syds of bridge deck grooving
A group of road construction equipment parked on the side of a street.

Bonner Bridge- Oregon Inlet,NC

  • 61,300syds of diamonds grinding segmental bridge deck